The Manufacturing Drawings were updated on 10.28.2015 (make sure to delete previous file). The changes are:
The first change: The depth of the hole for the cam axle has been decreased.
The second change: The size of the chamfers has been increased.
Monday’s schedule for the Manufacturing Competition.
Set up is from 1-5 pm.
Folders are due at 4:00 pm (this is different from nationals).
Dinner Break 5:00-9:00 pm
Production Run 9-9:30 pm
Team critique time and production demo to other teams 9:30 – 10:30 pm.